Skip to content
mimi

Construction Scheduler – T&D/Substation

Quanta Infrastructure Solutions Group

US · On-site Full-time 7mo ago

About the role

About Us

QISG leverages Quanta’s comprehensive resources to deliver collaborative solutions for our partners' energy infrastructure needs. We use in-house talent, expertise and resources to plan, design, engineer, manage, conduct maintenance on and construct projects.

Our turnkey service capabilities provide our customers with efficiency, consistency, attention to detail and safe execution. The QISG team brings together Engineering, Safety, Quality, Material Procurement, QA/QC, Right-of-Way Acquisition, Scheduling, Environmental Planning, Permitting, Title and Land Management expertise that ensure outstanding results for our clients.

About This Role

P6 Scheduler – Utility T&D & Substation

QISG is seeking a Primavera P6 Scheduler with 5+ years of utility experience in Transmission & Distribution (T-Line) and Substation projects — required and must be clearly shown on the resume.

  • This role builds and manages resource- and cost-loaded P6 schedules, performs critical path analysis, and partners with project teams to drive execution across EPC projects.
  • Office Location: 4249 Easton Way, Columbus, OH 43219
  • Travel Requirement: Up to 20% (domestic)
  • Relocation Assistance: Available for qualified candidates relocating to Columbus
  • Work Authorization: Visa sponsorship is not available for this role

What You'll Do

  • Develop and manage LSM and CPM Primavera P6 schedules for utility transmission, substation, and renewable projects
  • Build and maintain resource- and cost-loaded schedules aligned with baselines and execution strategies
  • Integrate inputs from engineering, procurement, construction, and commissioning teams
  • Perform critical path analysis, what-if scenarios, and productivity tracking
  • Identify schedule risks, evaluate sequencing, and recommend mitigation strategies
  • Produce earned value metrics, KPIs, and cash flow reports for project controls and executives
  • Support look-ahead planning, short-interval schedules, and continuous improvement
  • Maintain compliant schedule documentation per contract and company standards

What You'll Bring

  • 5+ years of scheduling experience supporting utility transmission lines (T-Line) and substations – required
  • Advanced Primavera P6 expertise, including cost- and resource-loaded schedule development
  • Experience with Linear Scheduling, large-scale sitework, and long-lead equipment planning for utility projects
  • Familiarity with TILOS, Deltek Acumen Fuse/Risk, or similar schedule analysis tools
  • Proven ability to collaborate with engineering, permitting, procurement, construction, and commissioning teams
  • Strong communication and influencing skills, coordinating across multiple departments
  • Highly organized and self-motivated, able to manage multiple priorities in fast-paced environments
  • Education: High school diploma required; Bachelor’s in Engineering, Construction Management, Business, or related field preferred

What You'll Get

  • Competitive base salary
  • Generous PTO & paid holidays to maintain work-life balance
  • 401(k) with a generous match to plan for your future
  • Comprehensive benefits – medical, dental, vision, and life insurance
  • Weekly pay for consistent, reliable compensation
  • Great mentoring & career growth opportunities – we invest in your development

Equal Opportunity Employer

All qualified applicants will receive consideration for employment and will not be discriminated against on the basis of race, color, religion, national origin or ancestry, sex (including gender, pregnancy, sexual orientation, and/or gender identity), age, disability, genetic information, veteran status, and/or any other basis protected by applicable federal, state or local law.

We are an Equal Opportunity Employer, including disability and protected veteran status.

We prohibit all types of discrimination and are committed to providing access and equal opportunity for individuals with disabilities. For additional information or if reasonable accommodation is needed to participate in the job application, interview, or hiring processes or to perform the essential functions of a position, please contact us the Company’s Human Resources department.

Skills

Primavera P6Linear SchedulingTILOSDeltek Acumen Fuse/RiskCritical path analysisEarned value managementSchedule risk analysisResource loadingCost loadingProject controls

Don't send a generic resume

Paste this job description into Mimi and get a resume tailored to exactly what the hiring team is looking for.

Get started free