AC
Reliability Engineers
Apetan Consulting LLC
US · On-site Contract 1mo ago
About the role
Overview
- Meeting to review the SOW / bid defense for 2226 (Swiftwater vaccine site): a site wide, multi tiered reliability & instrumentation initiative.
- Project goal: ~$3.0M in cost avoidance through EM strategy updates, obsolescence mitigation, spare parts optimization and reliability improvements; 11 LTAPs ongoing this year.
- Expected engagement: 1 year activity, team of 2-4 reliability/instrumentation engineers (no more than 4), on site 5 days/week; SAP S/4HANA + Indiesoft integration for maintenance/calibration.
- Procurement timeline and process: proposals delivered in Sales Graphs (plus the Excel attachment in the SOW); proposal deadline May 4; review window 48 hours; shortlisted suppliers will present 30 minute bid defense calls; target kickoff June 1 / mid June (subject to blackout adjustments).
Project Scope
- Work focuses on reliability engineering and instrumentation to reduce maintenance costs across the Swiftwater vaccine site.
- Primary activities called out: update EM (equipment maintenance) strategies, identify unnecessary calibrations, review spare parts inventory, assess material master functional equivalency, and create an obsolescence strategy for components.
- The SOW is a broad LTAP driven program (multiple sections) rather than a single deliverable; the approach is multi faceted to accumulate savings.
- Deliverables must include documented activities and quantified savings estimates so leadership can evaluate the ROI.
Team & Staffing
- Required skill sets: reliability engineering, instrumentation, calibration, preventive maintenance, program management, SAP S/4HANA (maintenance), and Indiesoft (calibration) experience.
- Staffing expectations: propose 2-4 on site contingent resources that can multi task across skill areas; suppliers should provide aggregate candidate profiles (not named individual r sum s).
- Resources are expected on site 5 days/week with limited flexibility for absences; vendor teams will be managed as contingent workers by the supplier but the client (John's team) will provide day to day direction.
- The engagement will extend existing internal reliability/maintenance staffing and include upskilling/handovers where needed.
Systems & Data
- Current maintenance systems: SAP S/4HANA for maintenance activities, with calibration executed through Indiesoft (recent conversion from ProCal).
- The opportunity is optimization of existing digital platforms (no platform migration planned); SAP and Indiesoft expertise is a critical skill set.
- Data required for assessments: spare parts inventory, LTAP sections (availability of materials, obsolescence), maintenance/calibration schedules and APM metrics.
Savings, Risk & Compliance
- The program is cost driven (not primarily compliance driven) and expects multi staged savings across streams (routine calibrations, PM elimination, improved APM, reduced scope, uptime gains).
- Expected cumulative effect of multiple smaller initiatives to reach or exceed the $3M ask; savings must be demonstrated and documented to secure leadership funding.
- Activities proposed must preserve current compliance levels while re allocating or reducing lower risk tasks; risk accounting and documentation will support changes.
- Outlook: the proposal and documented early wins will be used to secure funding and proceed to implementation pending selection and blackout constraints.
Skills
IndiesoftInstrumentationPreventive MaintenanceProgram ManagementReliability EngineeringSAP S/4HANA
Don't send a generic resume
Paste this job description into Mimi and get a resume tailored to exactly what the hiring team is looking for.
Get started free